Prefab house in Niwy Ostrołęckie
Niwy Ostrołęckie, about 50 km from Warsaw · house · build · 2025 · 2 months
A rental house that arrived with wiring and plasterboard in place. Part of it had to be corrected.




Visible
A mezzanine with a steel-mesh balustrade, stairs, gable glazing about 6 m high, tiling and second fix.
Hidden
Defects in the earlier construction put right, plasterboard and wiring redone, surfaces reinstated and finished at heights of up to 6 m.
Result
Handed over in two months, on the date set in the contract.
Let's talk about your property
Tell us about your project
