Prefab house in Niwy Ostrołęckie

Niwy Ostrołęckie, about 50 km from Warsaw · house · build · 2025 · 2 months

A rental house that arrived with wiring and plasterboard in place. Part of it had to be corrected.

Prefab house in Niwy Ostrołęckie (1)
Prefab house in Niwy Ostrołęckie (2)
Prefab house in Niwy Ostrołęckie (3)
Prefab house in Niwy Ostrołęckie (4)

Visible

A mezzanine with a steel-mesh balustrade, stairs, gable glazing about 6 m high, tiling and second fix.

Hidden

Defects in the earlier construction put right, plasterboard and wiring redone, surfaces reinstated and finished at heights of up to 6 m.

Result

Handed over in two months, on the date set in the contract.

Let's talk about your property

Tell us about your project
WhatsAppStart a project